Sumec menuSumec menu

SUMEC TOUCH WORLD

Global Trading Service Platform for Machinery

search Search
Image
中文
Image
+86 25-84532303
Image
sunyuchen@sumec.com.cn
1 / 1
TRD underground continuous wall construction machine
iconicon
Post RequirementsPost Requirements
ZIZHU HIGH-TECH
ZIZHU HIGH-TECH icon
View more
Post RequirementsPost Requirements
ZIZHU HIGH-TECH
ZIZHU HIGH-TECH icon
China
Main Products:
Pile driver
icon

Product information

TRD method is a method of vertically inserting a chain type cutting tool box on the ground, connecting the chain type cutting tools in sections, drilling vertically into the design depth, and the main machine moving horizontally along the wall direction. A construction method that involves cutting and mixing ditches and injecting cement solidification solution, mixing the solidification solution with the undisturbed soil, and constructing a continuous underground wall of equal thickness. China introduced these support system technologies from Japan at the beginning of this century and began promoting them in Shanghai, Hangzhou, and other places. Due to their superior performance in both theory and practical application, their safety and maturity have been increasingly recognized in the industry.

All products in the store
TAE series tracked mechanical transport vehicleAll products in the store
Hydraulic vibration hammerAll products in the store
Hydraulic impact hammerAll products in the store
TRD underground continuous wall construction machineAll products in the store
S-TRD Shallow Cement Soil Mixing Construction Method MachineAll products in the store